CNW 6858 is ready to depart the Oak Creek Power Plant with an empty coal train in March of 1989. Chessie power was common at this time and the CNW unit on the point was required for signals on the... (more)
WSOR operated. UP run thru ballast train to Rock Spring, WI to be loaded.